Monday 16 November 2009

Readjustements

After being told we needed more performance and lip syncing in our project we decided to try for a final time to adjust what needed to be done. So as the group meet outside of college in Cambridge city center, Ben brought a drum kit and some drum sticks to appear as if he was playing the drums. Unfortunately it happened to rain the day we wanted to shoot some footage so it may have looked odd the difference between the beginning of our film where the roads are dry, but this was obviously a factor that we couldn't really control.
Also we came up with another problem which was that none of us had the track to play out loud therefore we could hardly do any lip syncing as we didn't know what the lyrics were.
Both of them factors created less and less chance of getting effective shots.

No response to “Readjustements”

Leave a reply

 
© 2009 GROUP 37 - Music Video 2008/93. All Rights Reserved | Powered by Blogger
Design by psdvibe | Bloggerized By LawnyDesignz